Source fiber optic cable from a factory that starts with the route.

Compare and source custom fiber optic cable from FiberXi's Shenzhen factory using route conditions, construction, drum plan and inspection requirements.

Get a Cable Quote
Armored fiber optic cable prepared for B2B project supply

A cable quotation is only comparable when the construction boundary is clear.

Fiber count and unit price are not enough to release a cable order. The route, installation method, tensile and crush conditions, water protection, jacket, armor, temperature range and delivery length all affect the finished construction.

FiberXi supports international B2B buyers from an 8,000 m² manufacturing base in Shenzhen. Project-specific performance, evidence, MOQ and lead time are confirmed against the released construction and quantity rather than presented as universal claims.

8,000 m²Shenzhen manufacturing base
ROUTEConstruction-led review
DRUMProject delivery planning

Build the RFQ around the installed route.

Give every supplier the same route assumptions, construction and evidence boundary before comparing commercial offers.

01

Fiber and transmission plan

Define the fiber category, count, wavelength use and equipment expectations before choosing the surrounding cable construction.

  • Singlemode or multimode category
  • Fiber count and identification scheme
  • Transmission distance and active-equipment requirement
02

Cable construction

Translate placement and environmental conditions into tube design, strength members, water blocking, armor and jacket requirements.

  • Duct, aerial, direct-burial or indoor route
  • Tensile, crush, bend and temperature boundaries
  • Metallic or dielectric construction considerations
03

Lengths and packaging

Connect route sections to production lengths, drum dimensions, end protection, sequential markings and shipment identification.

  • Cut length and tolerance schedule
  • Drum, coil or reel requirement
  • Site, route and phase labels
04

Evidence and shipment release

State which construction documents, optical checks and shipment inspections are required for the actual purchase order.

  • Released datasheet and drawing revision
  • Agreed test population and report fields
  • Drum condition and quantity reconciliation

Control the cable from route input to receiving check.

01

Send the route schedule

Share installation method, distances, fiber count, environment and target delivery plan.

02

Release the construction

Confirm materials, dimensions, markings, lengths, evidence and approved alternatives.

03

Inspect the shipment

Reconcile finished cable, drums, documents, quantities and visible shipping condition.

Questions to close before quotation.

Can FiberXi quote from an existing cable part number?

Yes, but the current datasheet, route duty and acceptance requirements should also be provided so assumptions and proposed equivalents can be reviewed.

Is armored cable always suitable for direct burial?

No. Armor is one feature. Water blocking, jacket, crush protection, route preparation and local installation requirements also affect suitability.

Can custom drum lengths be supplied?

Route-based lengths can be reviewed against manufacturing, handling, drum-size and transport limits. The released schedule should state tolerance and labeling.

What determines cable MOQ and lead time?

Construction, material availability, fiber count, jacket or marking requirements, length plan, inspection scope and order quantity can all affect the quotation.

Have a cable datasheet, route schedule or current sample?

Send the fiber count, construction, route, lengths, quantity, destination and required evidence for a quote-ready review.

Send Cable Requirements