← Back to products
Armored outdoor fiber optic cable

PRODUCT 08 / FIBERXI

Armored Fiber Cable

Armored fiber cable adds mechanical protection for routes where crush resistance, rodent risk or installation conditions require more than a standard jacket. The armor construction, fiber type and environmental rating should be matched to the route design and local installation practice.

Get a Quote →

Specify the details that affect the installation.

  • Singlemode and multimode fiber options
  • Indoor, outdoor and indoor/outdoor constructions
  • Metallic or dielectric protection options
  • Fiber count and jacket configuration by project

Where this product is commonly used.

Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.

  • Industrial and campus backbone routes
  • Outdoor ducts and protected direct-burial runs
  • Telecom routes with higher mechanical exposure

Prepared around your customer requirements.

  • Fiber count and cable construction
  • Drum length and delivery schedule
  • Route-specific packing and identification
  • Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.

Have a drawing, part number or project list for Armored Fiber Cable?

Send Your Requirements →