← Back to products
Outdoor fiber optic splice closure

PRODUCT 05 / FIBERXI

Splice Closure

Fiber optic splice closures protect splices and cable entries in outdoor, aerial, duct or direct-buried network sections. A suitable closure is selected by cable diameter, port type, fiber count, splice capacity and installation environment—not by capacity alone.

Get a Quote →

Specify the details that affect the installation.

  • Dome and inline closure structures
  • Splice-tray capacity options
  • Cable port, oval port and sealing arrangements
  • Mechanical protection for outdoor cable entries

Where this product is commonly used.

Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.

  • Outside-plant cable joints
  • FTTH feeder and distribution networks
  • Aerial, duct and buried cable routes

Prepared around your customer requirements.

  • Cable diameter and port configuration
  • Splice tray quantity
  • Installation accessory set
  • Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.

Have a drawing, part number or project list for Splice Closure?

Send Your Requirements →