← Back to products

PRODUCT 02 / FIBERXI
SC/APC Drop Cable
SC/APC drop cable assemblies are prepared for access-network runs where the equipment interface and optical-reflection requirement call for an angled physical-contact connector. Configuration should follow the route, bend condition, termination interface and packaging plan rather than a generic cable description.
Get a Quote →CONFIGURATION POINTS
Specify the details that affect the installation.
- SC/APC connector assemblies
- Singlemode G.657 bend-insensitive fiber options
- Indoor, outdoor and indoor/outdoor drop constructions
- Pre-terminated length and protective packing options
PRODUCT APPLICATION
Where this product is commonly used.
Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.
- FTTH subscriber connection
- Access-network termination
- Building entry and customer-premises installation
CUSTOMIZATION & DELIVERY
Prepared around your customer requirements.
- Length schedule by installation point
- Connector-end protection and pull aid
- Staged project packing
- Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.