← Back to products
Rack mount fiber optic patch panel

PRODUCT 07 / FIBERXI

Rack Patch Panel

Rack patch panels provide a defined interface for termination, splicing and patching inside telecom racks and data cabinets. The working configuration should account for rack position, adapter type, fiber count, cable entry and the space required for serviceable fiber management.

Get a Quote →

Specify the details that affect the installation.

  • Rack-mount panel and enclosure formats
  • LC, SC and MPO/MTP adapter arrangements
  • Splice, termination and patching configurations
  • Cable entry, tray and accessory options

Where this product is commonly used.

Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.

  • Data center racks
  • Telecom distribution frames
  • Enterprise and campus equipment rooms

Prepared around your customer requirements.

  • Adapter plate and port count
  • Pre-loaded or unloaded panel format
  • Rack label and packaging plan
  • Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.

Have a drawing, part number or project list for Rack Patch Panel?

Send Your Requirements →