← Back to products

PRODUCT 06 / FIBERXI
PLC Splitter
PLC splitters distribute one optical signal to multiple paths in passive optical networks. The correct configuration depends on splitting ratio, package style, connector requirement, wavelength plan and how the splitter will be installed inside the selected enclosure or rack.
Get a Quote →CONFIGURATION POINTS
Specify the details that affect the installation.
- Common 1×N and 2×N split configurations
- Bare fiber, steel-tube, ABS box and rack formats
- Connectorized and unterminated options
- Fiber length and port identification options
PRODUCT APPLICATION
Where this product is commonly used.
Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.
- FTTx passive optical networks
- Distribution boxes and fiber cabinets
- Central-office and access-network splitting
CUSTOMIZATION & DELIVERY
Prepared around your customer requirements.
- Split ratio and package selection
- Input/output connector configuration
- Port labels and pre-installation layout
- Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.