← Back to products

PRODUCT 03 / FIBERXI
MPO/MTP Trunk Cable
MPO/MTP trunk assemblies help reduce installation work in high-density optical channels when the fiber count, polarity and end-to-end mapping are confirmed before production. We review the channel drawing and connector arrangement so the assembly can match the intended equipment-side connection.
Get a Quote →CONFIGURATION POINTS
Specify the details that affect the installation.
- MPO/MTP multi-fiber connector formats
- MPO-8, MPO-12 and MPO-24 arrangements
- Polarity and breakout mapping review
- Custom trunk length, fanout and labels
PRODUCT APPLICATION
Where this product is commonly used.
Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.
- Data center spine-leaf and backbone links
- High-density equipment patching
- Pre-terminated structured cabling
CUSTOMIZATION & DELIVERY
Prepared around your customer requirements.
- Polarity drawing confirmation
- Cassette and panel compatibility review
- Pulling protection and route-specific packing
- Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.