← Back to products
LC duplex fiber optic patch cord

PRODUCT 01 / FIBERXI

LC Patch Cords

LC patch cords provide a compact duplex connection for equipment, panels and high-density cabling. FiberXi can prepare singlemode or multimode assemblies around the connector format, cable construction, length and identification requirements of your project.

Get a Quote →

Specify the details that affect the installation.

  • Singlemode OS2 and multimode fiber options
  • Simplex, duplex and breakout constructions
  • LC/UPC and LC/APC configurations where applicable
  • Custom length, jacket color, boot color and labels

Where this product is commonly used.

Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.

  • Data center cross-connect and equipment patching
  • Telecom cabinets and optical distribution frames
  • Enterprise backbone and structured cabling

Prepared around your customer requirements.

  • Sequential labels and cable IDs
  • Project packing and carton marking
  • Buyer-specified cable length list
  • Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.

Have a drawing, part number or project list for LC Patch Cords?

Send Your Requirements →