← Back to products

PRODUCT 04 / FIBERXI
Fiber Distribution Box
Fiber distribution boxes organize incoming cable, splitting, termination and customer-side connections in a protected enclosure. Selection starts with installation environment, cable entry, port count, adapter arrangement and the practical space needed for splicing and fiber routing.
Get a Quote →CONFIGURATION POINTS
Specify the details that affect the installation.
- Wall-mount and outdoor enclosure formats
- Adapter, splitter and splice-tray arrangements
- Cable entry and sealing options
- Port-count configuration for access networks
PRODUCT APPLICATION
Where this product is commonly used.
Share the equipment interface, route condition and quantity requirement. We will help confirm the configuration points that should be clear before quotation and production preparation.
- FTTH distribution points
- Building and campus fiber termination
- Outdoor access-network transitions
CUSTOMIZATION & DELIVERY
Prepared around your customer requirements.
- Adapter type and port layout
- Splitter integration
- Cable-gland and accessory selection
- Factory testing, visual inspection and shipment preparation can be aligned to the agreed order requirement.