Turn custom fiber assembly options into a controlled production release.

Plan custom fiber optic cable assemblies with controlled interfaces, fiber, fan-out, length, labels, testing, samples and repeat-order revisions.

Request a Custom Assembly
Fiber optic cable assembly work inside the FiberXi factory

Custom does not mean undefined.

Custom assemblies are repeatable when the connector, fiber, cable, fan-out, length, labeling, evidence and packing are connected to one part number and revision. The approved sample should verify that same document rather than become an undocumented exception.

FiberXi supports build-to-requirement assemblies within the confirmed product and production scope. Feasibility, MOQ, sample timing and evidence are stated in the quotation after the requested variant is reviewed.

DRAWINGControlled configuration
SAMPLEApproval reference
REVISIONRepeat-order control

Close functional choices before cosmetic choices.

The specification pack should let technical, quality, purchasing and production teams identify the same deliverable.

01

Optical interface

Define connector family, polish, fiber category, count, polarity and mapping against the actual mating system.

  • Connector and adapter interface
  • Fiber category and count
  • Polarity, keying and port map
02

Mechanical construction

Specify cable, fan-out, furcation, boots, pulling protection and route-relevant handling requirements.

  • Cable diameter, jacket and color
  • Fan-out length and breakout protection
  • Bend, pull and installation constraints
03

Identification and evidence

Connect customer part numbers and circuit labels to the agreed inspection or test record boundary.

  • Label text, sequence and location
  • Endface, loss or mapping evidence
  • Lot, carton or item traceability scope
04

Sample and repeat orders

Approve the configuration, reports and packing under one revision, then control later substitutions and changes.

  • Drawing and sample approval
  • Deviation and alternative-material review
  • Repeat-order part number and revision

Keep the approved sample connected to every repeat order.

01

Issue the requirement

Send drawings, interfaces, lengths, quantities, labels, evidence and application context.

02

Approve the build

Review sample, measurements, marking, reports and packing against one revision.

03

Release production

Close deviations before volume production and preserve the revision for reorder control.

Questions to close before quotation.

What information is needed for a custom assembly quote?

Provide endpoints, mating interfaces, fiber, cable, length, fan-out, labels, quantity, application, destination and required evidence.

Can FiberXi work from an existing sample?

A sample can support review, but a controlled drawing or specification is still needed to define hidden materials, tolerances, evidence and approved changes.

Does every custom order require tooling?

No. Tooling depends on whether standard components and processes can achieve the requested construction. Any one-time work should be separated in the quotation.

How are substitutions controlled?

Requested or supplier-proposed changes should be identified against the released revision and approved before production or shipment.

Ready to release a custom fiber assembly?

Send the drawing, current sample reference, interface, quantity and acceptance requirements for feasibility review.

Start a Custom RFQ